Service project
Contact Us

Phone: 400-058-3522

Fax: 021-60543522

Email: service@msn.com

Web: visionjoinery.com

sider
Service project

Move the air conditioning machines

air conditioning move steps:

i. preparation: staff the door disassemble and complete set of tools and safety equipment.

II. recover refrigerant. first boot refrigeration. outdoor unit running take fluoride closed the valves, valve closed valve after the Frost melts instantly shutdown

pull off power, tighten insurance Cap. move the air conditioning refrigerants collected in the outdoor unit of the machine.

III. split indoor units. when removing the indoor unit, should prevent the condensed water into the circuit board;

IV. Remove outdoor unit. Remove outdoor machines should be unloaded balance to avoid vibration shaking. Lastly with plastic wrap so that handling.

v. installation. air conditioning installation should pay attention to the installation position and flow. Finally, detergent leak, observing each connector has no bubbles emerge, once after the system is leak-free, screw the valve protecting Cap.

VI. inspection. Finally ruled out of air in the pipe and power test-run installation is complete.

BACK